On Highway 97 in Molino, Escambia County approved Bluewater Creek Estates in December 2024. It has 33 homes on 185.88 acres, with water from Molino Utilities and septic systems for wastewater. On County Road 297A in Cantonment, the county gave LaVelle Terrace preliminary plat approval on May 13, 2026, for 265 single-family townhome lots on 38.48 acres, with ECUA water and sewer.
That works out to about five and a half acres per home on Highway 97 and about a seventh of an acre per lot in Cantonment. When the Highway 97 project was filed, NorthEscambia.com reported that it would use septic because sewer was not available there. The sewer line that would carry Cantonment-style density north of Quintette Road is still on ECUA's planning sheets, and in the most recent five-year budget its construction money starts in fiscal 2028.
The Approvals Along the Corridor, Side by Side
When the county's development records for north Escambia are lined up next to each other, the projects fall into two groups. The large-lot plans rely on Molino Utilities water and private septic. The tightly spaced plans are tied to ECUA sewer.
| Project | Location | Acres | Lots | Approx. acres per lot | Water and wastewater on record |
|---|---|---|---|---|---|
| Bluewater Creek Estates | Highway 97, Molino | 185.88 | 33 | 5.6 | Molino Utilities water, septic |
| Barrineau Estates, proposed | Highway 95A, Molino | 305 | 305 | 1.0 | Molino Utilities water, private septic |
| Bella Terra master plan | Highway 29 near Neal Road, Cantonment | 131.20 | 440 | 0.3 | Cottage Hill Water, ECUA sewer |
| LaVelle Terrace | County Road 297A, Cantonment | 38.48 | 265 | 0.15 | ECUA water and sewer |
When Bluewater Creek was proposed in July 2023, NorthEscambia.com reported lots of 4 to 12 acres, with Hammond Engineering as applicant and engineer. The lots have been sold as homesites for buyers to build on, and one 4.14-acre homesite sold for $165,000 in April 2026. Barrineau Estates, between Chipper and Straughn roads on Highway 95A, was still an application awaiting more information and a final vote when NorthEscambia.com covered it in July 2024.
Density also climbs at the Quintette Road corner itself. Carrington Valley was first filed in 2023 as 146 single-family lots on 145.6 acres fronting both Highway 29 and Quintette Road. Its Phase II final plat, approved in February 2025 according to the Pensacola News Journal, has 82 lots on a 17-acre parcel.
The Pipe That Was Supposed to Move North
ECUA, the Emerald Coast Utilities Authority, has a project on its books called CS0020. It is a sewer force main from ECUA's Central Water Reclamation Facility to the intersection of Highway 29 and Mathison Road. ECUA describes it as the backbone for extending sewer service north of Quintette Road along Highway 29. The utility's own project sheet says the force main now running south of Quintette is too small for the growth planned south of Molino.
In the FY2025–2029 Capital Improvement Program, presented to the ECUA board in a letter dated February 3, 2025, the project carried a total of $5.6 million: $600,000 in fiscal 2025 and $5 million in fiscal 2026. It was to be cost-shared with developers planning large projects in the area.
The current FY27–31 CIP budget book, with data updated October 1, 2026, has renamed the project "Highway 29 Force Main Oversizing" and made it a phased job. It shows no construction money for fiscal 2027, then $1.2 million in fiscal 2028, $10 million each in fiscal 2029 and 2030, and $7 million in fiscal 2031. The five-year total is $28.2 million. The book also says the mapped route is conceptual and the final route has yet to be determined.
Between those two budgets, the project's price roughly quintupled, and the bulk of the spending moved from the middle of this decade to the end of it. The dates are ECUA's spending plan for the pipe, which is a step ahead of any single parcel's hookup.
What Woodland Park Was Built Around
The biggest plan that depends on this pipe is Woodland Park. The proposal Exit 3 Investments brought to the county covered about 1,486 acres west of Highway 29 and south of Barrineau Park Road. It included 2,065 single-family lots, 2,356 townhomes and apartments, and nearly 100 acres of commercial space. As NorthEscambia.com reported in July 2023, the single-family lots were drawn at 50 by 120 feet and 60 by 130 feet. Water was to come from Molino Utilities, with Cottage Hill Water Works as a backup, and sewer from ECUA.
A 50-by-120-foot lot is about a seventh of an acre, close to LaVelle Terrace's density and far smaller than any lot in the Molino Utilities and septic rows of the table.
The Pensacola News Journal reported on July 20, 2023 that the developer had withdrawn its requests for higher density on part of the project. The paper also reported that the county had approved the development order for phase 1 and that engineering plans for phase 2 were ready. The developer planned to put money toward water and sewer and was working with the county on Woodland Parkway, a road from Mathison Road to Quintette Road.
Mathison Road is where ECUA's force main is drawn to end. The same investment group was also named as an owner of the proposed Mathison Subdivision, which in July 2022 was filed as 400 single-family homes on 133.7 acres off Mathison Road, in three phases. The densest plans in the Molino area are clustered around the place where ECUA plans for the sewer to end.
Reading the Current Market Against the Pipe Schedule
When the Woodland Park plan was filed in 2023, NorthEscambia.com quoted county planning staff saying development in the area was moving north and west. The ECUA budget sets the pace. The approvals that depend on ECUA sewer sit in Cantonment, and the approvals north of Quintette are mostly large lots on septic.
The resale market has been the other choice for buyers. Listing-portal data for ZIP 32577 shows 54 active listings in October 2026, up about 46% from a year earlier. The median sold price was $387,000, up about 5%, and homes sold for about 95% of asking that month. Molino sees only a few sales in any given month, so one month's median can swing easily. Even so, more listings and sales below asking point to a market where buyers have room to compare. Across the wider two-county area, the Pensacola Association of Realtors' September 2026 report counted 843 residential and condo closings, up from 797 in September 2025, with a median sale price of $319,900, down from $324,900.
Road work is moving on a separate schedule. Escambia County approved an $850,000 FDOT Transportation Regional Incentive Program grant toward rebuilding the Highway 95A and Quintette Road intersection. The $2.375 million project lines up the two legs of Quintette Road, which are offset by about 115 feet, adds a traffic signal, and adds a westbound right-turn lane for logging trucks heading north on 95A. On the 2026 rural transportation priority list, a six-lane Highway 29 from I-10 to the Alabama line and a four-lane Highway 97 from Molino to the state line appear as proposals. One is a feasibility study and the other is early engineering.
For a household weighing north Escambia, ECUA's yearly capital budget is the document to watch, because the force main line in each new CIP shows when ECUA expects to pay to extend sewer north of Quintette. Under the plan published in October 2026, the large-lot setting of Highway 97, Highway 95A and the land around Mathison Road rests on a utility schedule whose construction spending runs through fiscal 2031. Buyers who want a smaller lot close to Pensacola will find the tighter, sewered subdivisions along Highway 29 and County Road 297A in Cantonment. Land values in the region also depend on what the parcel fronts. Our look at why McDavid land costs more than Walnut Hill land found highway frontage driving the price, and road frontage matters in Molino as well.
If you're weighing a homesite on Highway 97 or 95A against a newer lot down in Cantonment, or you own Molino acreage and want to know what the sewer schedule could mean for it, the team at PHD Realty is glad to talk it through with you. Start with our Molino neighborhood page, or contact us about the parcel you have in mind.